Projects

2015-05-08 002 2015-05-08 003

Narragansett Ocean Front

Beachfront cottage elevated above base flood elevation in a high hazard V-Zone.  New FEMA compliant foundation installed, interior and exterior renovation.

front

Narragansett New Build

New 3456 SF with large deck and great views of Point Judith Harbor/Sand Hill Cove

9 12 18-pdf
EAII7863 (1) - Copy

South Kingstown
Lift & Addition

Existing structure was moved and a new elevated reinforced concrete pier founation was installed to reset the existing house upon and build new addition.  The raised foundation created stunning views of Block Island from the masterbedroom and master deck.

Narragansett New Build

Modern Farmhouse

New build on small irregular shaped lot.

Narragansett New Build
In Floodplain

Tear down and new build. New elevated two story  home in AE-13 flood zone.  New FEMA compliant foundation.Zoning, Building & CRMC approvals

Westerly, RI
Renovation

Oceanfront Renovation

Narragansett Historic Renovation

Historic Renovation (1901): Providence Telephone Company

The renovated space is to include 5 bedrooms, 2 full bathrooms, 1 half bathroom and 2 three quarter bathrooms. It will also include an interior garage.

The new space includes a 3rd floor cupola and roof deck with an Ocean view.

North Kingstown
Design-Build

Design-Build project located in a FEMA V-Zone.  

Matunuck
Design-Build

Design-Build project located in a FEMA AE-Zone.  

Trawlworks Inc.

Commercial Building Design-Engineer-Build Structural Modifications

Built on a former landfill, the structure had severe settlement issues with the slab and foundation. A new reinforced concrete ribbed mat slab installed.  6000 sf, 30 tons of steel reinforcement and 240 yards of concrete.  24 ports were installed for monitoring settlement beneath the structue and allow for future grout jacking

The Plastics Group

Industrial Mill Building-Design-Engineer-Build Structural Modifications

This project consisted of the constrcution of a new transfer facility that included new loading docks, a Pre-engineered Metal Building and a VRC (Vertical Reciprocating Conveyors) used to move materials between multiple floor levels.